Page 42 - 2012 SDCA Project
P. 42
2009 Date: 14-Jul-12
LEED Version 2009 BD&C Project Analysis and Budget Sales Tax 7.00%
LITHONIA WOMANS CLUB
SUSTAINABILITY Lithonia , GA Burden 36.10%
5.00%
Fee
Ins/Fees
3.19%
PROPOSALS Yes 7 likely 8 Maybe 1 unlikely No Sustainable Sites 26 Points COST IMPACT
7
3
USGBC LEED ANALYSIS Y Prereq 1 Construction Activity Pollution Prevention Required
AND BUDGET 1 Credit 1 Site Selection 1
5 Credit 2 Development Density & Community Connectivity 5
1 Credit 3 Brownfield Redevelopment 1
6 Credit 4.1 Alternative Transportation, Public Transportation Access 6
1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1
3 Credit 4.3 Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles 3
2 Credit 4.4 Alternative Transportation, Parking Capacity 2
1 Credit 5.1 Site Development, Protect or Restore Habitat 1
1 Credit 5.2 Site Development, Maximize Open Space 1
1 Credit 6.1 Stormwater Design, Quantity Control 1
1 Credit 6.2 Stormwater Design, Quality Control 1
1 Credit 7.1 Heat Island Effect, Non-Roof 1
1 Credit 7.2 Heat Island Effect, Roof 1
1 Credit 8 Light Pollution Reduction 1
Yes + +/- - No
10 Water Efficiency 10 Points COST IMPACT
Y Prereq 1 Water Use Reduction 20% Required
4 Credit 1 Water Efficient Landscaping, Reduce by 50% or 100% 2 to 4 $26,003
2 Credit 2 Innovative Wastewater Technologies 2 $5,417
4 Credit 3 Water Use Reduction, 30%, 35% & 40% Reduction 2 to 4
Yes + +/- - No $31,420
14 12 9 Energy & Atmosphere 35 Points COST IMPACT
Y Prereq 1 Fundamental Commissioning of Building Energy Systems Required
Y Prereq 2 Minimum Energy Performance Required
Y Prereq 3 Fundamental Refrigerant Management Required
7 5 7 Credit 1 Optimize Energy Performance 1 to 19 $4,876
3 2 2 Credit 2 On-Site Renewable Energy 1 to 7 $43,339
2 Credit 3 Enhanced Commissioning 2
2 Credit 4 Enhanced Refrigerant Management 2
3 Credit 5 Measurement & Verification 3
2 Credit 6 Green Power 2
continued… $48,214