Page 80 - 2022 SDCA Project
P. 80
MECHANICAL SYSTEMS
Plumbing
The plumbing systems also appear adequate but there are some
leaks evident in Hagar House that need to be investigated. The
plumbing system has an added level of complexity as the rear
Hagar House building is below the level of the city sewage system
and thus must have a “grinder pump” lift station to pump sewage
waste to the city sewer. Storm water must also be collected in
sumps and pumped to the city storm water system. These systems
appear to be functioning properly but require continual maintenance
and monitoring. During any renovations, care must be taken to keep
them operational and maintained.
Fire Sprinkler System
Both buildings are currently fully sprinklered for fire protection and
appear to be up to date and certified for occupancy.
81