Page 80 - 2022 SDCA Project
P. 80

MECHANICAL SYSTEMS




         Plumbing
         The plumbing systems also appear adequate but there are some
         leaks evident in Hagar House that need to be investigated. The

         plumbing system has an added level of complexity as the rear
         Hagar House building is below the level of the city sewage system
         and thus must have a “grinder pump” lift station to pump sewage
         waste to the city sewer. Storm water must also be collected in
         sumps and pumped to the city storm water system. These systems

         appear to be functioning properly but require continual maintenance
         and monitoring. During any renovations, care must be taken to keep
         them operational and maintained.

         Fire Sprinkler System

         Both buildings are currently fully sprinklered for fire protection and
         appear to be up to date and certified for occupancy.





                                                                                                                                     81
   75   76   77   78   79   80   81   82   83   84   85