Use of the 2nd Floor Loft area will probably require a
second means of egress be installed. This might be from
the center section, out the window to a platform and then
down a ladder or stairs to grade or along the roof back to
the existing fire escape platform.
Solar panels for energy are always advisable, but the
buildings and property are so shaded, this does not seem
very feasible. Panels for solar heating for hot water might
be a good option as not many panels would be required
and a small sunny area could probably be found for them.