Additional Notes

                Use of the 2nd Floor Loft area will probably require a
                second means of egress be installed. This might be from
                the center section, out the window to a platform and then

                down a ladder or stairs to grade or along the roof back to
                the existing fire escape platform.

                Solar panels for energy are always advisable, but the
                buildings and property are so shaded, this does not seem

                very feasible. Panels for solar heating for hot water might
                be a good option as not many panels would be required
                and a small sunny area could probably be found for them.