Page 70 - 2018 SDCA Project
P. 70

This set of sustainable standards on the following pages were created                                               Sustainability should be integrated throughout every project and has

                 to use as a resource as you begin implementing your project.                                                        been a driver of this design vision. For ease of understanding, a


                                                                                                                                     number of industry best practices have been outlined on the following

                 These recommendations are rooted in research and based around your                                                  pages for reference and integration. It’s important to note that while


                 expressed needs and goals.                                                                                          these areas are outlined in different sections, sustainability is most

                                                                                                                                     successful when it’s integrated as a systematic holistic approach


                 Please contact us at information@sdcatlanta.org with any questions.                                                 starting with site design all the way through building systems such as

                                                                                                                                     HVAC through detailed furniture and finish selections. This integrated

                 Please note:
                 All rights reserved.                                                                                                approach has been taken with the design of the overall project.
                 IMPORTANT DISCLAIMER:  This publication is intended to provide general information and
                 should not be construed as final construction documentation.  Consult a licensed professional
                 to complete any drawings and ascertain that all applicable codes are followed.  The SDCA
                 Board and/or any professional and/or other volunteers who have contributed to this project and
                 publication shall not be liable for any incidental or consequential damages in connection with,
                 or arising from or out of, the use of this publication.
                                                                                                                                                                                                                              SDCA 70
   65   66   67   68   69   70   71   72   73   74   75