Indoor Environmental Quality





              Minimum Indoor Air Quality Performance


               Ensure the final design of the building has suitable air quality for resident wellbeing.


                ●     Meet at a minimum, ASHRAE 62.1 2010 performance requirements for the indoor air

                      quality performance.
                ●     Have the project’s mechanical engineer conduct the calculations and provide

                      confirmation of compliance.




              Building Flushout



                ●     Perform an entire Building Flushout: at the end of construction before occupancy.

                        ○    (Reduces the level of toxic chemicals building occupants are exposed by flushing them out
                             of the space. These chemicals or material “off-gassing” are often left in the building and are

                             caused by the off-gassing of non-sustainable materials used in the building during
                             construction.)

                ●     Have your mechanical engineer determine how many days the flush-out needs to
                      occur to meet the following conditions: 14,000 cubic feet of outdoor air per square foot

                      of the floor area.

                ●     Turn on all HVAC systems at full operation for the number of days determined needed

                      for the flush-out and have windows open.
                ●     Maintain and indoor temperature of 60 degrees Fahrenheit or GREATER during the

                      flushout

                ●     Maintain an indoor humidity level of 60% or LOWER during the flushout period
                ●     Use a MERV 8 filter or greater during the flush out                                                                                                                 Building Flushout

                ●     Replace the HVAC filter with at least a MERV 8 or greater (MERV 13 ideal) after the

                      flush out period

                ●     Provide routine checks on all HVAC systems
                ●     Replace the MERV 8 or higher air filters regularly