ELECTRICAL SYSTEMS
With the replacement of the main transformer on the first floor,
any major issues should be handled. The existing electrical
system appears to be in good working order.
With the renovations/upgrades, the electrical systems will
need to be reconfigured/extended. With this work, all areas
should be reviewed to ensure they are code compliant and
have sufficient power and lighting for the facility’s needs.
As a matter of course, we recommend that all new and
replacement lighting be LED type fixtures. All rooms should be Occupancy Sensors
equipped with occupancy sensors, and certain common areas
can benefit from daylight sensors to dim when daylight is
sufficient.
With today’s technologies and proliferation of electronic
devices, it is imperative that sufficient power outlets and
charging stations be incorporated into the design. It is
assumed that the Center will have its own WiFi system for the
users. There will also be some hardwired data ports needed
for staff. Space utilization and furniture layouts should be
carefully considered so that floor outlets can be accurately
located for installation during the renovations. LED Light Bulb