SITE OVERVIEW PARKING LOT
SDCA identified the following needs for the DCM exterior spaces: The parking lot at the front of the property is in need of resurfacing
- Re-pave and re-stripe the parking lot and restriping. As it is currently laid out, there is space for 6 cars.
- Optimize the courtyard space DCM would ideally have 7 spaces to provide capacity for each
- Address drainage problems at the south side of the building room, the executive director, and one handicap space. A parking
- Address drainage problems at the stormwater detention weir behind study reveals that this would be possible if the dumpster can be
the building moved to a new location behind one of the parking spaces. This
position may compromise access to the dumpster, and the parking
space would need to be left vacant prior to trash pickup. The 7
parking spaces could then be provided as long as two of them
were smaller spaces limited to compact vehicles.
In both plans, the addition of a new landscape strip in front of the
existing handicap ramp allows space for evergreen shrubs
(azaleas would work nicely in this shady spot) to soften the facade
of the building. Refer to the following page for both parking lot
layout options. Dimensions are included to facilitate re-striping.
13