This narrative addresses the sustainable strategies, systems and                                                The plumbing systems, as mentioned, have just finished renovations in the


            upgrades recommended to be incorporated into the renovations to                                                 upper levels, but this needs to be continued for the first floor.

            the existing Solomon’s Temple Foundation facilities. The existing                                               The following recommendations are to improve the energy, water and waste


            building was built in the early 1990’s as a steel frame building with                                           systems in the building for better efficiencies that result in reduced energy and

            composite floors and a brick exterior that has had some minor                                                   operational costs as well as longer term savings and better performance. This


            renovations over the years, but which is basically as originally built.                                         is not a professional engineering review or report, but rather strategies to be

            There have been recent renovations and upgrades to the bathrooms                                                explored for incorporation into any renovations/expansion to the existing


            on the upper levels, an electrical transformer replacement and                                                  facilities.

            elevator repairs.                                                                                               A further caveat is that all renovations/upgrades will need to be fully compliant


                                                                                                                            with building existing codes.


            The major HVAC systems have been replaced within the last 5 years
                                                                                                                           The electrical systems appear to be original and the switchgear and main
            or so and seem to be in good working order. The kitchen equipment

                                                                                                                           panels are probably useable, but power distribution and lighting need to be
            appears to be original, but seems serviceable with some
                                                                                                                           upgraded.
            repairs/upgrades probably needed.